Brick Pair at dusk, two gabled brick houses on one lotPlans for builders
Service

Plan sets for home builders and spec builders

A house drawn to be bid, built and sold, then drawn again for the next lot with the same details and the same standard.

Who this is for

Builders who buy lots, build houses and sell them work on a different clock from a homeowner. The plan has to price well with subcontractors, sell in its market and pass plan check without long delays, and the next lot needs the same again. TECTO Studio draws plan sets for builders and spec builders, from the first site study to the issued permit, at a fixed fee agreed up front.

Where the studio works with builders

The studio works with builders in Los Angeles and Southern California and in the markets where small builders replace older houses lot by lot: Los Angeles and California, San Diego, Sacramento, the Inland Empire, Phoenix, Atlanta, Dallas, Nashville, Denver, Charlotte, Raleigh, Seattle, Miami and Oklahoma City. Each city has its own zoning and its own plan review, so every set is drawn to the city that permits it, with a local structural engineer on the structural sheets. The United States page explains how that works from Los Angeles.

Price and terms

One price per square foot, fixed before the work starts, for the design and the permit set.

HouseFixed fee
Per square foot of living area$12
2,000 sq ft house$24,000
3,000 sq ft house$36,000
4,000 sq ft house$48,000
Hillside lot, three or more stories, or a basement$15 per sq ft
The same plan on your next lot40% of the original fee
Minimum fee$15,000
  • First plan in a week. The first layouts arrive within a week of the first payment, the survey and the lot details.
  • Included. The lot study, two or three layouts with 3D views, the full design, the permit set with the engineers' sheets coordinated into it, the filing, and every round of plan check corrections on the drawings until the permit is issued.
  • At cost, quoted before the start. The structural engineer, the energy report, the survey, the soils report and city fees. Each one is a fixed line in the quote, so you know the total on day one.
  • Paid in four steps. 30% at the start, 30% when the design is approved, 25% when the set is filed and 15% when the permit is issued.
  • Changes. One round of changes on the chosen layout and one on the full design are included. After the design is approved, each change is quoted as a fixed fee before it is drawn.

Houses for your market

A short PDF for builders in each group of markets, with two houses, their drawings and the steps to the permit: California, Texas and Arizona, Tennessee and the Carolinas, Denver and Seattle and Florida.

A plan that prices well

Construction cost is set mostly in the plan, before anyone picks a finish. The studio draws builder plans with that in view:

  • A simple footprint. Fewer corners and fewer changes in the roof line mean less framing, less flashing and fewer places for water to get in.
  • Stacked walls and plumbing. Bearing walls, wet walls and stairs line up from floor to floor, so the structure and the plumbing stay short and direct.
  • Standard sizes. Spans, window sizes and ceiling heights follow standard lumber and stock window sizes where the design allows.
  • Finishes chosen early. Materials are named on the drawings, so every bidder prices the same house.

The custom home cost guide sets out where the money goes in a Los Angeles house, from permit fees to construction.

Repeatable details

A builder who builds the same wall, window and roof edge on every house builds them faster each time, and the crews stop asking questions. The studio keeps a set of standard details for each builder: wall sections, window and door heads and sills, roof edges, stairs and wet areas. Each new house starts from that set, and a change made once goes into every plan that follows.

A family of plans for several lots

A developer with several lots often needs more than one house type. The studio draws a family of plans: two or three house types that share the same details, the same structural approach and the same specification, with different sizes and layouts for different lots. Each lot then gets its own site plan, its own setbacks and its own filing, while the house types stay the same.

What stays the sameWhat changes lot to lot
Details, specification and materialsSite plan, setbacks and grading
Wall, window and roof assembliesHouse type and orientation
Structural approachUtility connections and driveway
Drawing standard and sheet orderZoning checks and city clearances

SB 9 and lot splits in California

SB 9 opened single-family lots in California to more homes. The HCD SB 9 fact sheet sets out what the law requires:

  • Ministerial approval. A city must approve, without a discretionary hearing, up to two primary units on a lot in a single-family zone, the split of that lot into two parcels, or both.
  • Up to four homes. A split lot with two units on each half can hold up to four homes in the area that held one house.
  • Units of at least 800 sq ft. A city must set aside local standards that would block two units of at least 800 sq ft each.
  • Four-foot setbacks. Side and rear setbacks are capped at four feet.
  • One split. A parcel may be split once under the lot split section of the law.

SB 9 units and ADUs can sit on the same project under the two laws, and HCD has enforced the SB 9 sections since January 1, 2024. Each city adds its own ordinance and its own eligibility checks, so the studio reads the local rules for each lot before any design starts. The SB 9 lot split guide explains the eligibility rules, and ADU design covers the second home on a lot.

Plan check turnaround

Every month a lot waits for its permit is a month of holding costs. The studio files a complete set in each city, so plan check spends its time on the house itself. Each round of corrections is answered on the drawings, with a written response that points to every revised sheet. In the City of Los Angeles, the permit application expires 18 months from the plan check submittal date (LADBS single-family correction sheet), so the clearances from other departments are started early. The single-family permit service describes the steps from filing to issue.

Lucas Rebouças leads every plan set, with ten years in residential design and permitting and more than 100 projects across single-family and multifamily.

Tell us about your lot.

lucas@tecto.studio  ·  310-490-7219

Send the address, what you want to build and when. Lucas replies with a scope, a fixed fee and the steps to the permit.