Single-family home design and permits in Nashville
Metro Nashville zones a lot for one house or for one and two, then reviews the site plan through Codes. The studio designs each house around both.
One government for the city and the county
Nashville and Davidson County share one Metropolitan Government, so a lot anywhere in the county is zoned by Metro and permitted by the Metro Department of Codes and Building Safety. The department describes itself as the hub of the building permit process (building permit process).
Metro adopted the 2024 International Code Council codes through ordinance BL2025-898, which took effect when the mayor signed it on July 16, 2025 (Metro Codes news). The adopted codes list includes the 2024 International Residential Code with local amendments (adopted codes).
RS and R districts
Metro's residential zoning separates lots meant for one house from lots meant for one or two. The Planning Department's staff reports describe the districts this way (Planning Commission staff reports, September 10, 2026):
- RS districts (Single-Family Residential). RS5 requires a 5,000 square foot lot, RS10 a 10,000 square foot lot and RS20 a 20,000 square foot lot, each intended for single-family dwellings.
- R districts (One- and Two-Family Residential). R6 requires a 6,000 square foot lot and R10 a 10,000 square foot lot, each intended for single-family dwellings and duplexes.
The same reports list the standards for an RS7.5 lot:
| Standard | RS7.5 |
|---|---|
| Minimum lot size | 7,500 sq ft |
| Maximum building coverage | 0.45 |
| Minimum rear setback | 20 ft |
| Minimum side setback | 5 ft |
| Maximum height | 2.5 stories |
| Minimum street setback | Contextual, or the district setback, whichever is greater |
Infill and the contextual setback
The street setback on an infill lot often depends on its neighbors. When a lot is subdivided, the staff reports set the new building line at the average setback of the two parcels on either side where that average is deeper than the district minimum, and for a corner lot both block faces are used. New houses must then meet the contextual setback standards of the Metro Zoning Code. New lots are also compared with the surrounding lots for area and orientation before a plat is approved.
On a narrow infill lot, those rules decide where the front wall sits and how deep the house can be. The lot study measures the neighboring setbacks from the survey before the first plan.
The permit steps at Metro Codes
A site plan is required for a residential construction permit, and the Zoning Examination staff review it for the setbacks. Construction plans are reviewed for houses over 5,000 square feet or more than three stories. Registered contractors apply for residential building permits online through ePermits, and most applications also need approval from other departments, such as water and sewer (residential building permits).
After filing, a Zoning Examiner is assigned and sends a checklist of the Metro approvals the project needs. Once every department signs off, Permit Issuance completes the bond and license review and collects the fee. Trade permits are separate, and the Use and Occupancy Division issues the final letter after the inspections (building permit process).
How the studio works in Nashville
TECTO Studio designs Nashville houses remotely, from the lot survey, the zoning and photos of the site:
- The lot. District, contextual setback, coverage, height in stories and any overlay, mapped onto the survey.
- The plan. Two or three layouts that sit inside that envelope.
- The design. Elevations, sections and materials for the chosen layout, with the street face set to the block.
- The permit set. The site plan the zoning examiners need, the drawings, and structural sheets from a local structural engineer.
- Plan check to permit. The builder files through ePermits, and the studio answers each review comment on the drawings until the permit is issued.
The work is priced as a fixed fee agreed up front. Builders with several Nashville lots can start at plans for home builders; owners can read about custom home design. The full list of markets is on the United States page.
TECTO Studio was founded by Lucas Rebouças, who spent ten years in residential design and permitting across more than 100 projects. Lucas leads the Nashville work personally.


