Court House at dusk, a concrete garden wall and a cedar-clad upper floorSingle-family permits
Service

Single-family permits, from filing to the issued permit

Plan check is a conversation with the city in drawings and written responses, and it ends when the permit is issued.

What the service covers

A house is designed once, but it is permitted in rounds. The building department reviews the set, returns corrections, reviews the revised set and, when every item is resolved and every other department has signed off, issues the permit. TECTO Studio takes a single-family house through that process, from filing to the issued permit, at a fixed fee agreed up front. The service is part of every house the studio designs.

Every city reviews houses its own way, with its own forms, portal, fees and timelines. This page follows the process at the Los Angeles Department of Building and Safety (LADBS), the department the studio files with most. The same steps apply, with local differences, in the other cities the studio works in: Los Angeles and California, Dallas, Nashville, Denver, Charlotte, Raleigh, Seattle, Miami and Oklahoma City.

Filing the set

The set filed for a new house holds the site plan, floor and roof plans, elevations, sections and details, the structural drawings and calculations, and the Title 24 energy forms. LADBS reviews plans on paper or through ePlanLA; for ePlan, revisions and responses are uploaded through the ePlanLA portal (LADBS single-family correction sheet).

The clock starts at filing. In the City of Los Angeles, the permit application expires 18 months from the plan check submittal date, according to the same correction sheet. A complete set at filing leaves more of that time for the review itself.

Plan check corrections, answered on the drawings

The LADBS single-family correction sheet, written to the 2026 Los Angeles Residential Code, sets out how a round of corrections is closed:

  1. The plan check engineer marks the corrections on the sheet, the plans and the calculations.
  2. The applicant gives a written response to each item, or a reference to the detail that resolves it, and identifies where on the plans each revision is.
  3. The revised set is verified by appointment with the plan check engineer, or uploaded through ePlanLA.
  4. The permit is issued once compliance with the corrections is verified.

TECTO Studio answers each item on the drawings themselves. Every response names the sheet and the detail it changed, so the engineer can close the item in one look. Questions from the structural or energy review go to the consultant who prepared those sheets, and the answers come back into the same set.

The clearances a house may need

Plan check covers the building code. Other departments review the parts of a house that touch their rules, and LADBS lists them on a clearance worksheet attached to the corrections. The correction sheet advises applying for these sign-offs right away, because some departments can take months, and every condition they set must be met before the permit is issued (LADBS single-family correction sheet).

Clearance or itemWhen it applies
Zoning Division of City PlanningWhen plan check calls for a zoning review
Low Impact Development sign-off, Bureau of SanitationNew construction or additions over 2,500 sq ft of impervious area
Soil, foundation or geology report approved by the Grading SectionWhen the site calls for one, often on a slope
Recorded affidavits and covenantsWhen the project depends on a recorded agreement
Recorded parcel or tract mapBefore the permit is issued on a newly created lot
Public Works approvalExcavations next to a public way
30-day notice to neighbors by certified mailExcavations deeper than an adjoining foundation and closer to the property line than their depth

A hillside lot adds its own items, from grading bonds to posting notices; see hillside home design.

The issued permit

The work ends when the permit is issued: the set is approved, the clearances are signed off, the fees are paid and the permit is in hand for the builder. Lucas follows each project through every round until that day, and keeps the approved set and the correction record in one place for construction.

The LADBS permit steps guide explains the process from filing to issue in more detail, and the custom home cost guide covers the permit fees around a Los Angeles house.

Who leads the work

Lucas Rebouças founded TECTO Studio after ten years in residential design and permitting, with more than 100 projects across single-family and multifamily. Every permit is led by Lucas from filing to issue. See custom home design and Los Angeles.

Tell us about your lot.

lucas@tecto.studio  ·  310-490-7219

Send the address, what you want to build and when. Lucas replies with a scope, a fixed fee and the steps to the permit.