Coral House, a long wood-clad upper floor over a coral stone base, beside a pool and royal palms in late sunMiami
Location

Single-family home design and permits in Miami

A house in Miami is zoned by Miami 21, filed through iBuild and built in the High Velocity Hurricane Zone, where the Florida Building Code is most stringent.

The City of Miami Building Department

This page covers the City of Miami. A lot elsewhere in Miami-Dade County is reviewed by the government that has jurisdiction there, under that government's zoning. Inside the city, all building permits are applied for electronically through the Building Department's iBuild portal. The plans and documents themselves are reviewed and approved in a second system, ProjectDox (City of Miami Building FAQs). Zoning designations can be looked up in the city's zoning interactive tool before an application is started.

The Florida Building Code and the High Velocity Hurricane Zone

The 8th Edition (2023) of the Florida Building Code took effect on December 31, 2023, and the Ninth Edition (2026) takes effect on December 31, 2026, according to Miami-Dade County's product control notices (Miami-Dade product approval notices).

Under the Florida Building Code, every county except Miami-Dade and Broward forms the non-High Velocity Hurricane Zone (non-HVHZ) part of the state. Miami-Dade, inside the HVHZ, has the most stringent requirements in the code (Miami-Dade construction materials brochure).

Product approvals and the NOA

The HVHZ changes how a house is specified. Products that make up the building envelope, including exterior doors, windows, shutters, skylights, roofing products and structural components, need an approval before they can be used in Miami-Dade County. That approval is a Notice of Acceptance (NOA) from the county's Product Control Section, and it sets out the information and instructions needed to show code compliance at permit, installation and inspection (Miami-Dade construction materials brochure). Code changes reach NOAs too: the county has posted notices that changes in the Ninth Edition will affect some current roofing NOAs.

For a builder, this means windows, doors and the roof are chosen early, with an approved product behind each one, before the elevations are final.

T3 zoning under Miami 21

Miami 21 is the City of Miami's zoning code. The T3 Sub-Urban transect zones are written for houses on their own lots, and come in three categories: Restricted (T3-R), Limited (T3-L) and Open (T3-O). The city's T3 reference manual, which reproduces Miami 21 as adopted in January 2018, sets out what each allows (City of Miami T3 manual):

  • T3-R. One principal building with one dwelling unit on each lot.
  • T3-L. One principal building with one dwelling unit, plus one outbuilding at least 10 feet from the main house.
  • T3-O. One principal building with two dwelling units.

The same manual lists the T3 building envelope:

StandardT3
Lot area and width5,000 sq ft and 50 ft minimum
Lot coverage50 percent first floor; 30 percent second floor in T3-R and T3-L
Setbacks20 ft front, 10 ft secondary front, 5 ft side (20 percent of lot width in total), 20 ft rear
Height2 stories and 25 ft to the eave
Green space25 percent of the lot

The manual notes that it is a reference only and that the Miami 21 Code, as amended, governs. The lot study checks the current code for each parcel, including any neighborhood overlay.

How the studio works in Miami

TECTO Studio draws Miami houses remotely, from Los Angeles. In T3-R and T3-L, the 30 percent limit on the second floor tends to produce a full ground floor with a smaller upper floor set over it. Each house follows five steps:

  1. The lot. The T3 category, setbacks, coverage on each floor and green space, drawn as an envelope for both levels.
  2. The plan. Two or three plan options that place the upper floor inside the second-floor limit the current code sets.
  3. The design. Elevations, sections and materials, with windows, doors and roofing chosen from approved products.
  4. The permit set. Plans, elevations, sections, details and product data for each opening and the roof, with structural sheets from a Florida structural engineer.
  5. Plan check to permit. The application goes in through iBuild, the drawings through ProjectDox, and every comment is answered on the sheets until the permit issues.

Every Miami scope is priced as a single fee, fixed and agreed before drawing begins. See plans for home builders for repeat plans across several lots, custom home design for a single house, and the United States page for how the studio works outside California.

Lucas Rebouças, founder of TECTO Studio, brings ten years in residential design and permitting and more than 100 projects across single-family and multifamily. Lucas leads every Miami house from the envelope study to the issued permit.

Tell us about your lot.

lucas@tecto.studio  ·  310-490-7219

Send the address, what you want to build and when. Lucas replies with a scope, a fixed fee and the steps to the permit.