Prairie Gable at dusk, a long brick house under a standing seam metal roof, lit through tall windows, set in prairie grasses and astersDenver
Location

Single-family home design and permits in Denver

Denver zones a single-family lot by its neighborhood context and its building forms, then reviews the house through e-permits. The studio designs to both.

Who reviews a house in Denver

The City and County of Denver reviews new houses through Community Planning and Development (CPD). Applications for a construction permit start in the city's E-permits portal. A project can also ask for zoning approval first and apply for the building review after it, a path the city calls phased review (how to apply).

On June 13, 2025, Denver adopted its 2025 building codes, based on the 2024 International Code Council codes except for energy, where the 2021 International Energy Conservation Code applies (Denver code adoption). For a house, CPD's checklist names the 2025 Denver Residential Code, the 2024 International Residential Code with Denver amendments, and the 2025 Denver Energy Code (new homes checklist).

Zone districts and building forms

The 2010 Denver Zoning Code sorts the city into neighborhood contexts. In the Urban Neighborhood Context, single-unit houses are typically the Urban House building form, and the letter in each single-unit district sets the minimum zone lot (Denver Zoning Code, Article 5):

DistrictMinimum zone lotTypical lot width
U-SU-A3,000 sq ft25 ft
U-SU-B4,500 sq ft37.5 ft
U-SU-C5,500 sq ft50 ft
U-SU-E7,000 sq ftnot stated

Each of these districts allows urban houses and detached accessory dwelling units. The A2, B2 and C2 versions also allow duplexes and tandem houses on certain corner lots. Division 5.3 of the same article sets the building form standards for primary structures. The lot study reads the form standards for the district, since they set the shape a new Denver house can take.

Teardowns and new houses on old lots

Where a new house replaces an old one, the old house needs its own permit first. CPD requires a demolition permit for the complete removal of a structure, or for removing 40 percent or more of its exterior wall area. Demolition review involves local and state agencies and can take up to two months (new homes checklist). That time belongs in the schedule from the start.

The same checklist lists what a new dwelling needs at submittal:

  • A survey. A boundary survey, land survey plat or improvement survey plat for a new dwelling on vacant land. Improvement location certificates are not accepted when a survey is required.
  • A geotechnical soils report. Required for every new dwelling.
  • Structural drawings. A complete load path from each point of origin to the foundation, with any design outside the prescriptive residential code engineered.
  • Energy documents. A Denver Energy Code residential checklist and Manual J, S and D reports for new heating and cooling equipment.
  • Sewer use and drainage review. Every development project is reviewed by the Sewer Use and Drainage Permit team.

For production builders

Denver offers production builders a Master Type Approved process. A master set of drawings gets one building review that is not tied to a site, and each house built from it then goes in as its own site-specific application (how to apply). A builder with a set of plans to repeat across lots can use the master set as the base; see plans for home builders.

What the studio does in Denver

TECTO Studio designs Denver houses remotely, working from the survey, the zoning and photos of the lot. The sequence is the same five steps:

  1. The lot. Neighborhood context, zone district, building form standards and any demolition on the site.
  2. The plan. Two or three layouts within the form standards.
  3. The design. The chosen layout developed in plan, elevation, section and material.
  4. The permit set. The drawings and energy documents, with the structural sheets from a local structural engineer working from the soils report.
  5. Plan check to permit. The application goes in through E-permits, and each set of review comments is answered on the drawings until the permit is issued.

Each project is quoted as one fixed fee agreed up front. Owners can read more on custom home design, and the United States page lists the other markets the studio covers.

Lucas Rebouças started TECTO Studio after a decade in residential design and permitting and more than 100 projects, single-family and multifamily. Each Denver house is led by Lucas from the lot to the permit.

Tell us about your lot.

lucas@tecto.studio  ·  310-490-7219

Send the address, what you want to build and when. Lucas replies with a scope, a fixed fee and the steps to the permit.