Twin Gables at dusk, two charred-wood gables around an oak, with a gravel court and a low stone wallSeattle
Location

Single-family home design and permits in Seattle

Seattle rewrote its Neighborhood Residential zones in 2025. A lot that once held one house can now hold several, and the permit path starts with a site visit.

SDCI and the construction permit

In Seattle, a new house or duplex needs a construction permit from the Seattle Department of Construction and Inspections (SDCI). That permit does not cover electrical, HVAC, plumbing or side sewer work, which have their own permits (SDCI).

The path starts before the plans are finished. The applicant completes the Building and Land Use Pre-Application in the Seattle Services Portal, with a site plan and a full legal description. Every new single-family or duplex project needs a pre-application site visit (PASV). The preliminary application report that follows says whether the project needs Design Review, SEPA review or street improvements, and flags potential project stoppers.

Plans are then screened, and an electronic intake appointment is booked through the portal, with every document uploaded by 7:00 a.m. on the day. About 75 percent of the permit fee is paid at submittal. SDCI aims to finish its initial review of a simple building, such as a typical new home, in about two weeks, and of a large or structurally complex building in about eight weeks. The plans are reviewed under the Land Use Code, the Seattle Residential Code, the Environmentally Critical Areas Code and the Stormwater Code.

Steep slopes and other critical areas

Much of the work on a hilly Seattle lot happens before intake. A topographic survey is required where the site has a steep slope or known slide area. A geotechnical report is required for a steep slope, potential slide, known slide, liquefaction, landfill or peat settlement prone area. Work in a steep slope area, or within 15 feet of its top or bottom, needs an approved exemption or steep slope relief before the intake appointment, or a land use permit (SDCI). The studio's approach to sloped lots is described under hillside home design.

Neighborhood Residential after HB 1110

Washington's middle housing law, HB 1110, requires cities to allow a wider variety of housing types, including duplexes, triplexes and stacked flats, in single-family zones (City of Seattle). In 2025, the Seattle City Council passed Ordinance 127376, which brought the Neighborhood Residential (NR) code into compliance with state middle housing law and aligned it with the One Seattle Plan. The NR zone now allows detached units, attached units such as townhouses, stacked units and accessory dwelling units (SDCI Neighborhood Residential code).

SDCI's illustrative zoning guide for the NR zone lists these core standards (SDCI NR zone guide):

StandardNR zone
DensityThe greater of 1 unit per 1,250 sq ft, 4 units, or 6 units near a major transit stop or with two affordable units; ADUs count
Height32 ft plus pitched roof allowances; 42 ft where tree, setback or Green Factor conditions are met
Front setback15 ft with one or two units; 10 ft with three or more
Side setback5 ft average, 3 ft minimum
Lot coverage50 percent

Floor area follows density. A lot with fewer than 1 unit per 4,000 square feet gets a floor area ratio of 0.6, rising to 1.6 at 1 unit per 1,600 square feet or more. A single house on a 5,000 square foot lot sits in the lowest tier: 0.6 times 5,000 allows 3,000 square feet. Lots under 5,000 square feet may build up to 2,500 square feet of chargeable floor area regardless of the ratio. Lots with critical areas lose density and coverage in proportion to the share of the lot they cover.

Choosing what to build on a lot

For a builder, the NR rules turn one lot into several possible projects: a single house, a house with one or two ADUs, or a duplex. Each one earns a different floor area ratio and front setback. The lot study draws the realistic options side by side with their areas, so the choice is made before design starts. The plans for home builders page covers how a builder's set is drawn to repeat.

How the studio works in Seattle

Seattle projects are drawn from the studio's base in Los Angeles. Each one follows five steps:

  1. The lot. The NR standards, critical areas, transit distance and setbacks, turned into a buildable envelope.
  2. The plan. Two or three plan options, each shown with the floor area it earns.
  3. The design. The chosen option drawn out in full: plans, elevations, sections, materials and the main details.
  4. The permit set. The drawings SDCI reviews, with structural sheets from a local structural engineer and, where the site needs one, the geotechnical engineer's report reviewed and its foundation requirements drawn into the set.
  5. Plan check to permit. Intake, corrections answered on the drawings, and the issued permit.

Before work begins, the scope is written down and priced as one fixed fee. A homeowner building one house can start from custom home design; the United States page covers projects outside California.

Lucas Rebouças founded TECTO Studio with ten years in residential design and permitting and more than 100 single-family and multifamily projects. Lucas leads every Seattle project from the lot study to the permit.

Tell us about your lot.

lucas@tecto.studio  ·  310-490-7219

Send the address, what you want to build and when. Lucas replies with a scope, a fixed fee and the steps to the permit.