Single-family home design and permits in Raleigh

Raleigh reviews a new house through one online portal and zones it under a code that now permits two-family homes in every residential district except R-1.

One city, one portal

Inside the city limits, the City of Raleigh handles both the zoning and the building permit for a new house. New single-family dwellings and duplexes are submitted directly through the city's Permit and Development Portal. Decks, porches, screened porches, garages and alterations follow other permit paths, and a detached ADU is treated as a single-family dwelling (City of Raleigh).

The city reviews every project for compliance with the Raleigh development code and the North Carolina State Building Code. Plan review comments can be read at any time from a registered portal account, and the city sends an email when a project is processed. Standard review times are posted online.

What the application asks for

The city's checklist for a new single-family dwelling or duplex lists five items:

  • the Residential Permit Application;
  • a site plan or survey;
  • the Residential Permit Data Form;
  • the lien agent designation;
  • construction drawings with elevations.

Two conditions can add work before filing. A project that adds 800 square feet or more of impervious surface, or concentrates flow, must meet the city's Lot Grading Plan requirements. A home in a historic district, or on a designated landmark, needs a Certificate of Appropriateness from the Raleigh Historic Development Commission, and that approval may be required before the permit application goes in (City of Raleigh).

The UDO and the missing middle changes

Raleigh zones land under its Unified Development Ordinance, the UDO. In the summer of 2021, City Council passed text change TC-5-20, which opened the residential districts to more housing types (missing middle FAQ):

  • Two-family homes. Permitted in all residential districts except R-1, under the same standards as single-family homes.
  • Townhouses. Once allowed only in R-10, now permitted in R-6, and in R-2 and R-4 as part of a development that includes open space.
  • Density. Units per acre are no longer regulated in most districts; R-1 is the exception.
  • Overlays. Neighborhood Conservation Overlay District rules did not change and apply to the new building types as well, such as two-family homes.

A later text change, TC-20-21, amended the UDO again; the city's FAQ notes that it includes ADU and cottage court regulations.

What this means for a builder

On many Raleigh lots a builder now has a choice to make before any plan is drawn: one house, a two-family home under the same standards, or a single house with an ADU behind it. The district, any overlay and the grading threshold decide which of those fits and what each costs to permit. The lot study puts the options side by side, so the decision is made on numbers.

A builder who builds the same house on several lots in the city gains the most from a set drawn to repeat: the same details, the same structure and the same specification, with a new site plan for each lot. See plans for home builders for how the studio sets that up. In Charlotte, the county reviews the building code instead; see Charlotte.

How the studio works in Raleigh

A Raleigh house moves through five steps with TECTO Studio, working from Los Angeles:

  1. The lot. The UDO district, any overlay, the setbacks and the grading threshold, read before design starts.
  2. The plan. Two or three plan options that fit the lot, including a two-family option where the district allows it.
  3. The design. The chosen plan developed into elevations, sections, materials and the main details.
  4. The permit set. Site plan, floor and roof plans, elevations, sections and details, with structural sheets from a local structural engineer.
  5. Plan check to permit. The set is filed in the portal, review comments are answered on the drawings, and the work ends when the permit issues.

The fee is fixed and agreed up front, and the scope names the house, the options and the city. Homeowners building one house will find the same process under custom home design, and the United States page sets out how the studio works with builders at a distance.

Lucas Rebouças started TECTO Studio after ten years in residential design and permitting, a record of more than 100 projects across single-family and multifamily. Lucas stays on each Raleigh project through every review round until the permit is in hand.

Tell us about your lot.

lucas@tecto.studio  ·  310-490-7219

Send the address, what you want to build and when. Lucas replies with a scope, a fixed fee and the steps to the permit.