Single-family home design and permits in Sacramento

Sacramento reviews every new house online and now measures neighborhood lots by floor area. TECTO Studio plans each house around both from the first sketch.

Who checks the plans in Sacramento

Inside the city limits, a new house is permitted by the Building Division of the City of Sacramento Community Development Department. The city lists a single-family residence among the projects that need plans, and every project that needs plan review goes in electronically through the Public Permit Portal, resubmittals included; the city does not accept paper plans (Electronic Plan Check).

The order of steps matters. Most building permits first need clearance from the Planning Division. Once Planning clears the project, the portal creates a Building Submittal Record (SUB) and the applicant is told by email what comes next. Where the code calls for solar on a new house, the solar plans go in with the rest of the submittal (Online Building Services). A lot in unincorporated Sacramento County, Elk Grove or Citrus Heights answers to another agency.

The code edition

Since January 1, 2026, the city has required new plan review and permit applications to comply with the 2025 California Building Standards Codes and the city's local amendments, adopted as ORD 2025-0031 (Building Codes). For a detached house, the core document is the 2025 California Residential Code, read together with the energy code and CALGreen, including the electric vehicle charging measures for new one- and two-family dwellings with attached garages.

The same page notes a rule that matters to builders with existing master plans. Under Health and Safety Code 18938.5(d), the standards in effect when a model home design was approved keep applying to later houses built from that design in the same jurisdiction, until the design changes substantially or ten years pass from the model's permit.

Master plans and production permits

For subdivision work, Sacramento uses a two-part online process. A builder first files the master plan with its checklists, including the options tables, which must also appear on the title sheet. Once that record is approved, production permit applications for individual lots go in through the portal (Master Plan and Production Permit Automation). A plan set built for this path is drawn once with clear options and reused lot by lot.

The zoning shift: floor area over unit count

Sacramento changed how its neighborhood zones work. On September 17, 2024, the City Council adopted the Missing Middle Housing Interim Ordinance (ORD2024-0027). From October 17, 2024, projects in the R-1, R-1A, R-1B and R-2 zones may earn more building area along a Sliding Floor Area Ratio Scale, up to the maximum set by the 2040 General Plan (Missing Middle Housing). The scale caps building area. The unit counts on it are minimums a project must provide to earn the extra floor area.

What this means for a single-family builder:

  • The ordinance applies to two or more primary units on a lot, or to one house on a lot of 1,200 to 2,899 square feet. On a lot of 2,900 square feet or more, the applicant may choose to use it for a single house.
  • Height, setbacks, lot dimensions and design review standards still apply, and with few exceptions the city code requires no onsite parking.
  • Projects under the ordinance go through Site Plan and Design Review and must meet its anti-displacement findings.
  • ADUs do not count toward the unit minimum or the site's maximum floor area.

The ordinance is labeled interim on the city's page, so the lot study confirms the current text before any massing. State ADU and lot split options apply as well; see the California ADU rules and the SB 9 lot split guide. The California page covers the rest of the state.

TECTO Studio's process for a Sacramento lot

The work is done remotely from a survey, the parcel's zoning record and photos:

  1. Site reading. Zone, setbacks, height, the floor area route that fits the project, and any planning entitlement the house will need.
  2. Concept plans. Two or three plan options inside that frame, with the builder's cost targets in view.
  3. Design. Plans, elevations, sections and materials for the option chosen, with any master plan options set out.
  4. Permit drawings. The complete set, with structural sheets by a structural engineer and the energy, green building and solar documents.
  5. Planning clearance and plan check. Filing in the Public Permit Portal and answering each review comment until the permit is issued.

Fees are fixed and agreed up front. See plans for home builders for builder work, custom home design for a single owner's house, and the United States page for other markets.

Lucas Rebouças leads each Sacramento project from the first plan to the permit, drawing on ten years in residential design and permitting and more than 100 single-family and multifamily projects.

Tell us about your lot.

lucas@tecto.studio  ·  310-490-7219

Send the address, what you want to build and when. Lucas replies with a scope, a fixed fee and the steps to the permit.