Single-family home design and permits in the Inland Empire
The Inland Empire is two counties and many cities, each with its own permit counter. TECTO Studio starts every house by naming the agency that will review it.
One region, many building departments
The Inland Empire spans Riverside and San Bernardino counties, and a new house there is reviewed by whichever government holds the parcel. Inside an incorporated city, that city's building division issues the permit. Outside city limits in Riverside County, Building and Safety, part of the Transportation and Land Management Agency, permits and manages grading, building inspections and plan checks for new construction in the unincorporated areas (County of Riverside). San Bernardino County's Building and Safety office takes new house applications through its EZ Online Permitting portal, under the "Residential New Construction" application type (EZOP).
Each city handles intake in its own way. A few examples from their own sites:
- Temecula requires digital submission for new tract and custom homes, made online through its Citizen Self Service portal, and asks applicants to register an account a week before they plan to submit (Temecula Building and Safety).
- Rancho Cucamonga lists Residential New Construction among the building applications in its Online Permit Center (Online Permit Center guide).
- Ontario takes applications through a permit portal and publishes its own electronic document review submittal requirements (Ontario Building).
The City of Riverside
In the City of Riverside, houses go through the Building & Safety Division of the Community & Economic Development Department. The city's Public Permit Portal lets applicants submit, pay fees and track progress at any hour of the day (Riverside online services), and plan check applications are accepted online or at the One Stop Shop. The plan check page states that most new projects need a 20 business day review and that resubmittals are checked within 10 business days. Expedited review may be offered for an added fee, subject to staff availability (Riverside plan check).
The city's submittal guidelines give new single-family dwellings their own project type and list the drawings a set typically holds: site plan, floor plan, ceiling plan, elevations, cross-sections, roof plan, framing and foundation plans, structural details, and electrical, mechanical and plumbing plans. Title 24 energy documents must be registered, signed and copied into the plans. A soil report with a study of liquefaction potential is required for newly proposed residential buildings, with exceptions decided case by case for small projects (Building plan check submittal guidelines).
Unincorporated Riverside County
The county's handout on residential submittals (form 284-179, revised November 2024) sets a standard PDF sheet of 24 by 36 inches, a maximum of 30 by 42, and one uniform size for every sheet. The site plan must be fully dimensioned, with property lines, streets, driveways, setbacks, structures and easements, and a survey may be required when the work sits close to a setback. Soils reports go straight to the county's grading department, truss calculations must come from the truss manufacturer, and heating and cooling equipment may not be placed within the required side or rear setbacks (General residential plan submittal requirements).
That last point shapes the site plan early. On a narrow lot, the location of the condenser and water heater is settled in the first layout, so it does not come back as a plan check comment.
The 2025 California codes and state housing law
California published the 2025 edition of the California Building Standards Code, Title 24, on July 1, 2025, with an effective date of January 1, 2026 (Building Standards Commission). A new house in any Inland Empire city is drawn to the 2025 California Residential Code, with the energy and green building parts of the same code, and the studio checks the reviewing city's own adoption for local amendments.
State law also opens options on many lots here: an accessory dwelling unit, a junior unit, or a two-unit project or lot split under SB 9. Each one changes the site plan, the utility layout and the order of permits. The California ADU rules and SB 9 lot split guides set out the state framework. The California page covers other cities in the state, and the Los Angeles page covers the studio's home market.
How TECTO Studio works on an Inland Empire house
The studio is based in Los Angeles and works from the survey, the title report, the zoning record and site photos:
- Agency and lot. The reviewing city or county, the zone, setbacks, height and any specific plan, drawn as one buildable outline.
- First layouts. Two or three plans inside that outline, each sized to the build budget.
- Design development. Elevations, sections, materials and the main details for the chosen plan.
- Construction set. The full drawing set, with structural sheets from a structural engineer, the soils and energy documents in place, and the sheet format the agency asks for.
- Plan check. Filing through the city or county portal and answers to each correction on the sheets until the permit issues.
Each house is priced as a fixed fee agreed up front. Builders with several lots can read plans for home builders; an owner planning one house can read custom home design. The United States page lists the other markets.
Lucas Rebouças, founder of TECTO Studio, leads every Inland Empire project. Lucas has ten years in residential design and permitting and more than 100 projects across single-family and multifamily work.


