Twin Gables at dusk, a house and an ADU in Pasadena, two charred-wood gables facing each other across a courtyardADU design
Service

ADU design and permits in California

A second home on the lot, drawn to the rules the state sets and the city applies, from the first site plan to the permit.

Four kinds of ADU

An accessory dwelling unit (ADU) is a second, complete home on a lot with a house. California law sorts it into a few types, and each type follows different rules. The HCD ADU Handbook sets them out.

TypeWhat it isMain limit in state law
Detached ADUA new building on the same lot as the houseTotal floor area up to 1,200 sq ft
Attached ADUAn addition joined to the houseUp to 50 percent of the existing house's floor area
Garage conversionAn existing garage turned into a homeNo new setback for the existing walls
JADUA unit inside the walls of the houseUp to 500 sq ft of interior living space

The floor area limits for detached and attached units are in Government Code section 66314. A local ordinance may set its own sizes within that frame, and the city that reviews the set decides which numbers apply to your lot.

How state law shapes an ADU

California rewrote its ADU law into Chapter 13 of the Government Code, sections 66310 to 66342, and the old section numbers no longer apply. A few rules set the shape of most designs.

  • Setbacks. A new ADU needs no more than four feet from the side and rear lot lines. A garage or other existing structure converted in the same place and to the same dimensions needs no setback at all (section 66314).
  • A floor of 800 sq ft. Local limits on lot coverage, floor area ratio, open space or front setbacks cannot block an ADU of at least 800 sq ft with four-foot side and rear setbacks (HCD ADU Handbook).
  • Height. A city may not cap a detached ADU below 16 feet. Within a half-mile walk of a major transit stop or a high-quality transit corridor, the floor is 18 feet, plus two feet to match the roof pitch of the house. An attached ADU may reach 25 feet or the height limit of the house, whichever is lower (HCD ADU Handbook).
  • Parking. A city may ask for no more than one space per ADU or per bedroom, whichever is less. When a garage is demolished or converted for an ADU, the lost spaces do not need to be replaced (section 66314).
  • Impact fees. An ADU of 750 sq ft of interior living space or less is exempt from impact fees charged by local agencies, special districts and water corporations (HCD ADU Handbook).

A JADU follows its own rules. It sits inside the walls of a single-family house, which can include an attached garage, and a lot may have one. If the JADU has no bathroom of its own, it needs an interior entrance to the main house. The ADU rules guide goes through each limit in more detail.

What the studio does

TECTO Studio designs the ADU and takes it to the issued permit, at a fixed fee agreed up front.

  1. The lot. The zoning, the local ADU ordinance, the setbacks, the existing house and garage, and where water, sewer and power reach the site. The result shows which types fit and how large each can be.
  2. The plan. One or two layouts for the unit, with its entry, its outdoor space and its windows placed to keep privacy between the two homes.
  3. The permit set. Site plan, floor and roof plans, elevations, sections and details, with the structural and Title 24 energy sheets from the consultants coordinated into one set.
  4. Plan check. The set is filed, each round of comments is answered on the drawings, and the work ends when the permit is issued.

When the ADU is part of a new house, both are drawn together, and the site plan places the two buildings as one composition. See custom home design.

How long the city has

State law sets the clock. Under Government Code section 66317, an ADU application is approved ministerially, without a hearing. The permitting agency has 15 business days to say whether the application is complete, and must list anything missing. Once the application is complete and there is a house on the lot, the agency has 60 days to approve or deny it. If it does neither, the application is deemed approved. If the ADU is filed together with a new house, the agency may hold the ADU until it decides on the house.

A detached garage demolished to make way for an ADU is reviewed with the ADU application, and the demolition permit is issued at the same time (section 66314).

Where

The studio is based in Los Angeles and draws ADUs across California. Each city applies state law through its own ordinance and its own plan check, so the first step is always the rules of the city that reviews the set. See California and the single-family permit service.

Lucas Rebouças leads every project, with ten years in residential design and permitting and more than 100 projects across single-family and multifamily.

Tell us about your lot.

lucas@tecto.studio  ·  310-490-7219

Send the address, what you want to build and when. Lucas replies with a scope, a fixed fee and the steps to the permit.