<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"><channel><title>TECTO Studio guides</title><link>https://tecto.studio/guides/</link><description>Practical guides on multifamily construction documents: podium code basics, plan check corrections, accessibility, Revit standards and the cost of production.</description><language>en-us</language><item><title>Accessible and adaptable units on a California multifamily set</title><link>https://tecto.studio/guides/accessible-units-multifamily-california/</link><guid>https://tecto.studio/guides/accessible-units-multifamily-california/</guid><pubDate>Sun, 04 Oct 2026 09:00:00 -0700</pubDate><description>How CBC Chapter 11A adaptable units and 11B mobility units are drawn on the enlarged unit plans: door clearances, kitchens, bathrooms and grab bar reinforcement.</description></item><item><title>A design development checklist for multifamily buildings</title><link>https://tecto.studio/guides/design-development-checklist/</link><guid>https://tecto.studio/guides/design-development-checklist/</guid><pubDate>Sun, 04 Oct 2026 09:00:00 -0700</pubDate><description>A design development checklist for multifamily buildings: what the DD set holds, what each discipline settles, and what has to close before CDs start.</description></item><item><title>Los Angeles multifamily permits, 2023 to 2026, in numbers</title><link>https://tecto.studio/guides/los-angeles-multifamily-permits-2026/</link><guid>https://tecto.studio/guides/los-angeles-multifamily-permits-2026/</guid><pubDate>Sun, 04 Oct 2026 09:00:00 -0700</pubDate><description>LADBS multifamily permit data for the City of Los Angeles, 2023 to 2026: filings, units, time from submittal to issue, stories and status, with charts.</description></item><item><title>Fire separation in multifamily buildings, drawn on the set</title><link>https://tecto.studio/guides/multifamily-fire-separation/</link><guid>https://tecto.studio/guides/multifamily-fire-separation/</guid><pubDate>Sun, 04 Oct 2026 09:00:00 -0700</pubDate><description>The IBC ratings an R-2 set is drawn around: unit separations, corridors, shafts and exit stairs, the sprinkler reductions, and how each shows on the sheets.</description></item><item><title>Permit drawings and construction drawings, and how they differ</title><link>https://tecto.studio/guides/permit-drawings-vs-construction-drawings/</link><guid>https://tecto.studio/guides/permit-drawings-vs-construction-drawings/</guid><pubDate>Sun, 04 Oct 2026 09:00:00 -0700</pubDate><description>What a permit set holds, what plan check reviews, and what changes between the approved set and the field set: deferred submittals, revisions, supplemental permits.</description></item><item><title>Title 24 energy compliance on a multifamily set</title><link>https://tecto.studio/guides/title-24-multifamily-compliance/</link><guid>https://tecto.studio/guides/title-24-multifamily-compliance/</guid><pubDate>Sun, 04 Oct 2026 09:00:00 -0700</pubDate><description>How California&#x27;s 2025 Energy Code applies to multifamily buildings: LMCC and NRCC forms, who signs them, and what the drawings must show to match them.</description></item><item><title>What construction documents are, and what a full set includes</title><link>https://tecto.studio/guides/what-are-construction-documents/</link><guid>https://tecto.studio/guides/what-are-construction-documents/</guid><pubDate>Sun, 04 Oct 2026 09:00:00 -0700</pubDate><description>What construction documents are, the phases that lead to them, what a full CD set includes, and how CDs differ from permit, bid and construction sets.</description></item><item><title>What a California density bonus changes in the drawing set</title><link>https://tecto.studio/guides/california-density-bonus-drawings/</link><guid>https://tecto.studio/guides/california-density-bonus-drawings/</guid><pubDate>Wed, 30 Sep 2026 09:00:00 -0700</pubDate><description>Gov. Code 65915 from the drawing side: the bonus chart, incentives and waivers, parking ratios, and the tables a density bonus set includes.</description></item><item><title>CBC 11A and 11B on a multifamily set</title><link>https://tecto.studio/guides/cbc-11a-vs-11b/</link><guid>https://tecto.studio/guides/cbc-11a-vs-11b/</guid><pubDate>Wed, 30 Sep 2026 09:00:00 -0700</pubDate><description>When California&#x27;s Chapter 11A applies to a multifamily building, when 11B does, where both apply, and how each shows up on the accessibility sheets.</description></item><item><title>What a drafter costs a small practice in 2026</title><link>https://tecto.studio/guides/cost-of-a-drafter/</link><guid>https://tecto.studio/guides/cost-of-a-drafter/</guid><pubDate>Wed, 30 Sep 2026 09:00:00 -0700</pubDate><description>Drafter salaries from the BLS for Los Angeles, New York and Chicago, the loaded cost of a hire, and the hours a practice needs before a hire pays for itself.</description></item><item><title>The 5-over-1 podium building and the code rules the set is drawn around</title><link>https://tecto.studio/guides/five-over-one-podium-code/</link><guid>https://tecto.studio/guides/five-over-one-podium-code/</guid><pubDate>Wed, 30 Sep 2026 09:00:00 -0700</pubDate><description>The IBC rules behind a 5-over-1 podium building: the 510.2 separation, height, story and area limits for Type IIIA and VA, and where each shows on the set.</description></item><item><title>LADBS clearances on a multifamily permit, department by department</title><link>https://tecto.studio/guides/ladbs-clearances/</link><guid>https://tecto.studio/guides/ladbs-clearances/</guid><pubDate>Wed, 30 Sep 2026 09:00:00 -0700</pubDate><description>The LADBS clearance worksheet on a multifamily permit: which departments sign off, what each reads from the drawings, and how to track clearance status.</description></item><item><title>How to answer an LADBS plan check correction sheet on a multifamily set</title><link>https://tecto.studio/guides/ladbs-plan-check-corrections/</link><guid>https://tecto.studio/guides/ladbs-plan-check-corrections/</guid><pubDate>Wed, 30 Sep 2026 09:00:00 -0700</pubDate><description>How a multifamily set&#x27;s LADBS correction sheet is answered on the drawings: ePlanLA uploads, keyed responses, clouded sheets, verification and extensions.</description></item><item><title>What a multifamily construction document set contains</title><link>https://tecto.studio/guides/multifamily-cd-sheet-list/</link><guid>https://tecto.studio/guides/multifamily-cd-sheet-list/</guid><pubDate>Wed, 30 Sep 2026 09:00:00 -0700</pubDate><description>A full construction document sheet list for a multifamily podium building, series by series, with what each sheet shows and how the list scales.</description></item><item><title>Responsible control in California when someone else draws the set</title><link>https://tecto.studio/guides/responsible-control-california/</link><guid>https://tecto.studio/guides/responsible-control-california/</guid><pubDate>Wed, 30 Sep 2026 09:00:00 -0700</pubDate><description>What the Architects Practice Act and 16 CCR 151 require when a team outside your office draws the set your architect of record signs and stamps.</description></item><item><title>Handing your Revit template to an outside production team</title><link>https://tecto.studio/guides/revit-standards-handoff/</link><guid>https://tecto.studio/guides/revit-standards-handoff/</guid><pubDate>Wed, 30 Sep 2026 09:00:00 -0700</pubDate><description>What to send an outside production team before the first sheet: the Revit template, title blocks, keynotes, shared parameters, version and worksharing setup.</description></item><item><title>The title-block check, 14 items every sheet passes before issue</title><link>https://tecto.studio/guides/title-block-check/</link><guid>https://tecto.studio/guides/title-block-check/</guid><pubDate>Wed, 30 Sep 2026 09:00:00 -0700</pubDate><description>A 14-item title block checklist for construction documents: numbers, titles, dates, revisions, scales, callouts and consultant references, with the Revit checks.</description></item></channel></rss>
